Arizona · Rock climbing · Gold Canyon · Near Superior

The Long Lead

5.8
grade
Trad Gear
style
Nov–Apr
best months

Is The Long Lead open right now?

Alert in the area

The Forest Service lists 5 alerts for Mesa Ranger District.

As of · Source: USFS · Mesa Ranger District. Agencies don't list every closure — check before you go.

One of 13 routes catalogued at Barks Canyon Wall, this climb sits in the moderate range of the crag's 5.6 to 5.11a/b span.

Around this trail

Add any of these when you start a trip
  • Sleep close

    Campground East

    Campground

    Campground · 3.5 mi from the trail
  • Eat after

    McDonald's

    Fast food

    Open after 6
  • If it rains

    Trails End

    Attraction

    On your way back · 14 mi

Places © OpenStreetMap contributors

More in Superior

Local outfitters

Not on Roamze yet. Their page has how to reach them.

  • Nearby · The Cemetery · Wild Horse Wall · The Fortress
  • Best time to go · Nov–Apr

    Best time to visit The Long Lead

    Best months: November–April. Best months have typical highs of 55–85 °F, lows of 30 °F or warmer (32 °F where the station doesn't record snow), at most one snowy day and no more than 12 wet days.

    1. Jan

      67° / 43°

      4 wet

    2. Feb

      70° / 44°

      4 wet

    3. Mar

      77° / 48°

      4 wet

    4. Apr

      85° / 53°

      2 wet

    5. May

      93° / 60°

      2 wet

    6. Jun

      103° / 69°

      1 wet

    7. Jul

      105° / 77°

      4 wet

    8. Aug

      104° / 76°

      6 wet

    9. Sep

      99° / 71°

      4 wet

    10. Oct

      88° / 60°

      3 wet

    11. Nov

      76° / 50°

      3 wet

    12. Dec

      66° / 42°

      4 wet

    Typical high / low (°F) and days with rain or snow, 1991–2020. Measured at Apache Junction 5 Ne, AZ, 8.4 mi away at 2,070 ft. The station sits about 1,300 ft lower than this place, so expect it a little cooler here. Source: NOAA NCEI U.S. Climate Normals 1991–2020.

Photo of the crag

Barks Canyon Wall — the crag this route is on
Barks Canyon Wall, Arizona — this photo shows the crag, not this individual route.Photo: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Keep exploring — more climbs worth the drive

The CemeteryPhoto: Alan English CPA from Scottsdale, Arizona 85254, USA, CC BY-SA 2.0 (via Wikimedia Commons)

The Cemetery

Next door

Cemetery, The in Arizona has 11 climbing routes on 7 difficulty grades.

Wild Horse WallPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Wild Horse Wall

Next door

Wild Horse Wall in Arizona has 17 climbing routes with 9 difficulty grades.

The FortressPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

The Fortress

Next door

12 climbing routes in Arizona spanning 8 difficulty grades.

Nosepicker PinnaclesPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Nosepicker Pinnacles

~1 min drive

6 traditional climbing routes at Nosepicker Pinnacles, Arizona.

Miners NeedlePhoto: Alan English CPA from Scottsdale, Arizona 85254, USA, CC BY-SA 2.0 (via Wikimedia Commons)

Miners Needle

~3 min drive

Miners Needle in Arizona has 6 traditional climbing routes.

SoutheastPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Southeast

~3 min drive

Southeast in Arizona has 5 trad climbing routes spanning 3 difficulty grades.

Lower East WallPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Lower East Wall

~3 min drive

Lower East Wall in Arizona has 5 traditional climbing routes across 4 grades.

NorthwestPhoto: Alan English CPA from Scottsdale, Arizona 85254, USA, CC BY-SA 2.0 (via Wikimedia Commons)

Northwest

~3 min drive

Northwest in Arizona has 6 climbing routes with 6 distinct difficulty grades, offering sport and trad climbing.

Carney Springs WallPhoto: David Taylor from Coeur d Alene, United States, CC BY 2.0 (via Wikimedia Commons)

Carney Springs Wall

~3 min drive

Carney Springs Wall in Arizona has 5 routes ranging from moderate to hard, offering sport and trad climbing.

Weavers NeedlePhoto: Deborah Lee Soltesz from Flagstaff, AZ, CC0 (via Wikimedia Commons)

Weavers Needle

~3 min drive

Weavers Needle in Arizona has 6 traditional climbing routes across 4 grades.