Montana · Hiking

Goat Lakes

4.5 mi
round trip
1,477 ft
climb
6,900 ft
high point
Out and back
route
Jul–Sep
best months

Is Goat Lakes open right now?

Alert in the area

The Forest Service lists an alert for Lolo National Forest.

  • East Fork Big Creek Road & Trail Closure- Superior Ranger District

    Agency alert covering Lolo National Forest · Order 26-003- · USFS · Lolo National Forest

As of · Source: USFS · Lolo National Forest. Agencies don't list every closure — check before you go.

Goat Lakes is a moderate out-and-back hike in the Plains/Thompson Falls Ranger District of Montana's Lolo National Forest, about 4.5 miles long with a one-way elevation gain of 1,477 feet. The trail starts at a low point of about 5,362 feet and climbs to a high point of about 6,900 feet. The route is on natural surface, and the Forest Service allows both horses and bikes. The trail is open year-round, and the nearest town is Thompson Falls. Summer is the most comfortable time to go. Typical averages from a nearby weather station at Mullan Pass, which sits about 870 feet lower than the high point, show July and August highs around 70°F with only about six wet days a month. Winter is cold, with January highs near 28°F and lows around 19°F. The Goat Lakes Connector lies about 0.8 miles away, and the Honeymoon Creek mountain biking trail is about 1.4 miles off. Arrowhead Lake and Copper King Campground are both within about 3.5 miles.

Route details

Distance
4.5 mi round trip
Climbing
About 1,477 ft
Summit
6,856 ft
Difficulty
Moderate
Time
About 2 hours

Season

Season: Year-round.

Questions about this route

How long is the Goat Lakes on Mount Silcox?

About 4.5 mi round trip.

How much elevation gain is on the Goat Lakes?

About 1,477 ft of climbing round trip.

How hard is the Goat Lakes?

It is rated moderate.

How long does the Goat Lakes take?

About 2 hours round trip.

When is the best time for the Goat Lakes?

Year-round.

Conditions and forecast on Mount Silcox

Daily highs and lows, wind and the chance of precipitation at the summit and route start for the next 7 days, from the Open-Meteo model.