Illinois · Bouldering · Pomona · Near Goreville

2 Fast 2 Furious

V5
grade
Bouldering Pads
style
Mar–May, Sep–Nov
best months

Caution at last check

Agency alerts are in effect for this area; weather is good · USFS, OpenWeather · checked 17 h ago

Is 2 Fast 2 Furious open right now?

Closure in the area

There's a closure order in Shawnee National Forest. It doesn't name 2 Fast 2 Furious, so check the source for the area it covers (2 listed).

As of · Source: USFS · Shawnee National Forest. Agencies don't list every closure — check before you go.

One of the harder problems at D: Atlas Boulder, where the grade span reaches V6. This climb sits near the top end of the 10 routes catalogued at the crag.

Around this trail

Add any of these when you start a trip
  • Sleep close

    Turkey Bayou

    Campground

    Campground · 4.9 mi from the trail
  • Eat after

    Mase's Place

    Bar and grill restaurant

    On your way back · 4 mi
  • If it rains

    Cobden Museum

    Museum

    On your way back · 10 mi

Places © OpenStreetMap contributors, Places © Overture Maps Foundation

More in Goreville