Montana · Hiking

Giebler

21.8 mi
round trip
3,154 ft
climb
6,169 ft
high point
Out and back
route

Is Giebler open right now?

Closure in the area

There's a closure order in Kootenai National Forest. It doesn't name Giebler, so check the source for the area it covers.

As of · Source: USFS · Kootenai National Forest. Agencies don't list every closure — check before you go.

Giebler is a hard hike in the Rexford Ranger District of Montana's Kootenai National Forest, about 22 miles long with a one-way elevation gain of 3,154 feet. The trail is an out-and-back that starts and ends at the Giebler/Lost Soul Divide TH 70 parking area, and it rises from a low point of about 2,657 feet to a high of 6,169 feet. The route is on natural surface, and it is open from May 1 through November 30. Bikes and horses are both allowed. Several other trails sit close by. Hickey Creek is under a mile away, and East Branch Big Creek is about 1.2 miles off. Rocky Gorge Campground, roughly 5 miles away, offers a place to stay, and Barron Creek Boating Site, about 6.5 miles away, is a fishing spot.

Local outfitters

Not on Roamze yet. Their page has how to reach them.

Route details

Distance
21.8 mi round trip
Climbing
About 3,154 ft
Starts at
GIEBLER/LOST SOUL DIVIDE TH 70 (about 5,558 ft)
Summit
6,170 ft
Difficulty
Hard
Time
About 9 hours

Getting there

Park at GIEBLER/LOST SOUL DIVIDE TH 70.

Other routes up Lost Soul Mountain

Questions about this route

How long is the Giebler on Lost Soul Mountain?

About 21.8 mi round trip from GIEBLER/LOST SOUL DIVIDE TH 70 (about 5,558 ft).

How much elevation gain is on the Giebler?

About 3,154 ft of climbing round trip.

How hard is the Giebler?

It is rated hard.

Where does the Giebler start?

GIEBLER/LOST SOUL DIVIDE TH 70 (about 5,558 ft).

How long does the Giebler take?

About 9 hours round trip.

How many routes go up Lost Soul Mountain?

2: East Branch and Giebler.

Conditions and forecast on Lost Soul Mountain

Daily highs and lows, wind and the chance of precipitation at the summit and route start for the next 7 days, from the Open-Meteo model.