Texas · Rock climbing · San Antonio

Construction Delays

Among the most difficult climbs at Metro Wall.

5.12-
grade
Sport Bolted
style

Best time to visit Construction Delays

Best months: October–April. Best months have typical highs of 55–85 °F, lows of 30 °F or warmer (32 °F where the station doesn't record snow), at most one snowy day and no more than 12 wet days.

  1. Jan

    63° / 41°

    7 wet

  2. Feb

    68° / 45°

    7 wet

  3. Mar

    74° / 52°

    8 wet

  4. Apr

    80° / 58°

    7 wet

  5. May

    87° / 66°

    8 wet

  6. Jun

    92° / 73°

    7 wet

  7. Jul

    95° / 75°

    5 wet

  8. Aug

    96° / 75°

    5 wet

  9. Sep

    90° / 70°

    7 wet

  10. Oct

    82° / 60°

    6 wet

  11. Nov

    72° / 50°

    7 wet

  12. Dec

    65° / 42°

    7 wet

Typical high / low (°F) and days with rain or snow, 1991–2020. Measured at San Antonio Intl Ap, TX, 5.9 mi away at 789 ft. This station doesn't record snowfall. Source: NOAA NCEI U.S. Climate Normals 1991–2020.

One of the hardest routes catalogued at Metro Wall, where climbs range from 5.7 to 5.12-.