7 Bridges
- 1.7 mi
- distance
- 278 ft
- climb
- Apr–Jun, Sep–Oct
- best months
7 Bridges is a mountain biking route on Bureau of Land Management land in the Uncompahgre Field Office in Colorado, about 1.7 miles long and roughly 280 feet of elevation gain one way. The trail starts at about 6,180 feet and reaches a high point of about 6,340 feet, with the steepest stretch at the beginning, where the grade reaches about 15%. The most comfortable months for riding are typically late spring and early fall. Typical averages from a nearby weather station in Paonia show May highs around 73°F and September highs around 79°F, while July averages about 90°F and winter brings frequent snow days. Several other trails sit close by. Heffendoodle is about 0.2 miles away, Baby Doodle about 0.4 miles, and Wapiti Whip and Jumbo Ridge each about half a mile. For paddling, Hubbard Creek is about 9 miles away.
Local outfitters
- Cedar Creek RV Park and Lodging31 mi away
- Palisade Basecamp45 mi away
Not on Roamze yet. Their page has how to reach them.
- HeffendoodleMountain biking0.2 mi
- Baby DoodleMountain biking0.4 mi
- Wapiti WhipMountain biking0.5 mi
- Jumbo RidgeMountain biking0.5 mi
- Desolation RidgeMountain biking0.5 mi
- Rock-n-RollMountain biking0.6 mi
- Plumber's CrackMountain biking0.6 mi
- Hubbard CreekCanoeing9 mi
Source: Roamze catalog (indexable pages within 10 miles, PostGIS distance)
Swampy PassMountain biking · ~37 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Castle PassMountain biking · ~37 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Silver BasinMountain biking · ~37 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Lowline Trail 438Mountain biking · ~40 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Mill CastleMountain biking · ~40 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Kebler Wagon TrailMountain biking · ~41 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)
Irwin Lake SpurMountain biking · ~41 min drivePhoto: Sheila Sund from Salem, United States, CC BY 2.0 (via Wikimedia Commons)
Daisy Pass Blue LakeMountain biking · ~41 min drivePhoto: Sheila Sund from Salem, United States, CC BY 2.0 (via Wikimedia Commons)
Dark CanyonMountain biking · ~36 min drivePhoto: John Sowell, CC BY-SA 4.0 (via Wikimedia Commons)- HeffendoodleMountain biking · Next door
Also worth it near here
- Small Boat LaunchBoat launch · ~4 min drive
Mount LambornSummit · ~8 min drivePhoto: Northforker, CC BY-SA 3.0 (via Wikimedia Commons)- West Reservoir Number OneLake fishing · ~18 min drive
Trail 860AHiking · ~18 min drivePhoto: Blake Patterson from Alexandria, VA, USA, CC BY 2.0 (via Wikimedia Commons)
Best time to visit 7 Bridges
Best months: April–June and September–October. Best months have typical highs of 55–85 °F, lows of 30 °F or warmer (32 °F where the station doesn't record snow), at most one snowy day and no more than 12 wet days.
Jan
39° / 16°
8 wet · 5 snow
Feb
45° / 22°
7 wet · 4 snow
Mar
56° / 29°
8 wet · 3 snow
Apr
63° / 34°
7 wet · 1 snow
May
73° / 42°
7 wet
Jun
85° / 51°
5 wet
Jul
90° / 57°
7 wet
Aug
88° / 56°
8 wet
Sep
79° / 48°
7 wet
Oct
67° / 37°
7 wet · 1 snow
Nov
53° / 27°
7 wet · 3 snow
Dec
40° / 17°
8 wet · 5 snow
Typical high / low (°F) and days with rain or snow, 1991–2020. Measured at Paonia 1sw, CO, 4 mi away at 5,581 ft. The station sits about 800 ft lower than this place, so expect it a little cooler here. Source: NOAA NCEI U.S. Climate Normals 1991–2020.
Map and trail data © OpenStreetMap contributors