Montana · Hiking

Boulder Point Lookout

4.7 mi
round trip
2,505 ft
climb
7,747 ft
high point
Out and back
route

Is Boulder Point Lookout open right now?

Alert in the area

The Forest Service lists 4 alerts for Bitterroot National Forest.

As of · Source: USFS · Bitterroot National Forest. Agencies don't list every closure — check before you go.

Boulder Point Lookout is a moderate out-and-back hike in the West Fork Ranger District of Montana's Bitterroot National Forest. The route covers about 4.7 miles and climbs roughly 2,505 feet from a low point near 5,252 feet to a high point of about 7,747 feet, making it a substantial but doable day on the trail. The trail is a natural surface route, and the Forest Service manages the surrounding land. Ward-Wheeler Creek and Boulder Creek both lie within about a mile and a half, giving hikers options for a shorter outing before or after the climb. Neslon and Trapper Peak are a little farther out at about 2.3 and 2.5 miles, so the area offers several ways to link trips together. Rombo campground sits about 4.3 miles away for an overnight stay, and the Nez Perce Fork, about 5.7 miles off, offers canoeing. Medicine Point Lookout campground is roughly 7.8 miles away.

Route details

Distance
4.7 mi round trip
Climbing
About 2,505 ft
Starts at
BOULDER CREEK TRAILHEAD (about 5,252 ft)
Summit
5,563 ft
Difficulty
Moderate
Time
About 3 hours

Getting there

Park at BOULDER CREEK TRAILHEAD.

Questions about this route

How long is the Boulder Point Lookout on School Point?

About 4.7 mi round trip from BOULDER CREEK TRAILHEAD (about 5,252 ft).

How much elevation gain is on the Boulder Point Lookout?

About 2,505 ft of climbing round trip.

How hard is the Boulder Point Lookout?

It is rated moderate.

Where does the Boulder Point Lookout start?

BOULDER CREEK TRAILHEAD (about 5,252 ft).

How long does the Boulder Point Lookout take?

About 3 hours round trip.

Conditions and forecast on School Point

Daily highs and lows, wind and the chance of precipitation at the summit and route start for the next 7 days, from the Open-Meteo model.