Offshore Rockfish Trip (Long-Leader)
An offshore rockfish charter fishing 30 feet off the bottom outside the 40-fathom line targeting larger rockfish species including Yellowtail, Widow, Canary, Bocaccio, Chilipepper, Redstripe, Greenstriped, and Silvergray rockfish. Anglers can keep up to 15 rockfish that typically average 6-8 pounds. All bait, tackle, bottled water, and coffee are included; fish are filleted and bagged at no extra cost.
About This Experience
An offshore rockfish charter fishing 30 feet off the bottom outside the 40-fathom line targeting larger rockfish species including Yellowtail, Widow, Canary, Bocaccio, Chilipepper, Redstripe, Greenstriped, and Silvergray rockfish. Anglers can keep up to 15 rockfish that typically average 6-8 pounds. All bait, tackle, bottled water, and coffee are included; fish are filleted and bagged at no extra cost.