Mullewa-Meekatharra Railway
- 23.6 mi
- round trip
- 352 ft
- climb
- 1,554 ft
- high point
- Out and back
- route
- Apr–Oct
- best months
Mullewa-Meekatharra Railway is an out-and-back trail, 24 miles each way (47 miles round trip) in Western Australia, Australia. It runs between about 1,380 ft and 1,550 ft above sea level, with roughly 150 ft of climbing one way. The nearest town is Cue, about 24 miles northeast of the trailhead. Peaks within about 3 miles include Tuckanarra Hill. Distances, elevations and the route shape here come from OpenStreetMap and the Copernicus 90 m elevation model. Trails, access rules and conditions change, so check locally before you go.
Conditions and forecast
Daily highs and lows, wind and the chance of precipitation at Mullewa-Meekatharra Railway for the next 7 days, from the Open-Meteo model.
Best time to visit Mullewa-Meekatharra Railway
Best months: April–October. Best months have typical highs of 55–85 °F, lows of 30 °F or warmer (32 °F where there's no snowfall data), at most one snowy day and no more than 12 wet days.
Jan
100° / 75°
5 wet
Feb
97° / 74°
7 wet
Mar
92° / 69°
6 wet
Apr
84° / 62°
8 wet
May
75° / 53°
9 wet
Jun
66° / 47°
10 wet
Jul
65° / 44°
11 wet
Aug
69° / 46°
11 wet
Sep
77° / 52°
10 wet
Oct
85° / 59°
6 wet
Nov
90° / 65°
4 wet
Dec
96° / 71°
6 wet
Typical high / low (°F) and days with rain or snow, 1981–2010. Modelled for the 1 km square this place sits in (average height 1,558 ft), not measured at a weather station. Snowfall days aren't in this data. Source: CHELSA 1 km climate model (1981–2010) and CRU TS 4.09 wet days. Data: CHELSA V2.1 climatologies (Karger et al. 2017), WSL (CC0 1.0); CRU TS 4.09 (Harris et al. 2020), University of East Anglia Climatic Research Unit. Contains public sector information licensed under the Open Government Licence v3.0. (Open Government Licence v3.0).
Map and trail data © OpenStreetMap contributors